SpaceX is preparing to conduct a Wet Dress Rehearsal ahead of Flight 14. Booster 21 was first to Pad 2, soon followed by Ship 41, as SpaceX continues to target September 28, pending regulatory approval.

⚡ Become a member of NASASpaceflight's channel for exclusive Discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡

Narration by John Galloway.
🎥 Video from Ceaser G, Colleen, Starbase Live.
✂️ Edited by Thomas Hayden (@_thomashayden).

🔍 If you are interested in using footage from this video, please review our content use policy: https://www.nasaspaceflight.com/content-use-policy/

L2 Boca Chica (more clips and photos) from BC's very early days to today.
🔗 https://forum.nasaspaceflight.com/index.php?topic=47107.0
(Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/)

Timestamps:
0:00 Starbase Summary
0:30 Two Aft Flaps Delivered
1:21 Delivery of Picnic Tables
1:38 Pad 1 OLM Construction
1:47 Pad 1 Flame Bucket Pipe Lifted
2:01 Work Inside the Gigabay
2:09 Bridge Crane Work
2:33 Starlink Loader Hooked to Crane
3:13 Nosecones Inside Starfactory
3:28 Ship 44's Nosecone Moved
3:41 Barge JMC-256 Arriving
4:02 Booster Work Stand for Gigabay
4:22 Orbital Pad 2
4:54 Slow Chopstick Movements
5:26 Raptor 134 From Booster 21
5:42 Booster 21 Rolled to the Pad
9:42 Booster 21 Lifted Onto the OLM
10:52 Booster 21 Grid Fin Testing

LDAPAABJRG2UMCU3